Cedar Siding Installation Tips
Cedar is a material that needs to be allowed to flex once installed.
Cedar siding installation tips. For optimal performance and appearance and to benefit from all the advantages the maibec warranty has to offer maibec siding must be installed with great care. Cedar siding can swell or shrink as it gains or loses moisture to reach equilibrium with the moisture content of the surrounding air. It is best that the siding slats be kept six to 12 inches off the ground so that the exposure to water is limited. But to minimize gaps take the time to miter angle cut and treat the ends as you install and the results will last for years.
How to install cedar bevel siding 1. Natural and semi coat all surfaces with the stain transparent stains solid color stains coat all surfaces with an and paints alkyd oil stain blocking primer. Wrap the house with a polyethylene or similar moisture barrier stapled to the wooden wall sheathing with a. Air or kiln dried siding that has been kept dry can be installed immediately.
Movement length wise is minimal. Door and window flashing. Recommended priming procedures for cedar siding. Let cedar siding flex and breathe.
Hot dipped galvanized aluminum and stainless steel nails are all corrosion resistant and can be. Also placing spacers between the slats will help to ensure a straight piece of siding. Siding stacked with vertically aligned stickers table 2. Roof ground clearance.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board. Ensuring that the moisture content of cedar siding is at equilibrium before it is installed will minimize movement later on. The purpose of flashing window and door headers is to intercept water behind the siding and direct it to the outside. Place nail just above the overlap.
The cedar siding is first acclimatized by storing on stickers. Type of recommended finish coat priming coat. Take care not to nail through the overlap of two pieces. Most wood expansion and contraction is across the width of the board.
Bevel siding should be face nailed to studs with 1 1 4 inch penetration into solid wood using one nail per piece spaced at a maximum of 24 inches on center. Do not reduce the siding overlap recommendations given in the installation sections of this publication. Western red cedar siding pre installation tips recommended fasteners. Fasten a cedar starter strip.
Damp siding should be allowed to acclimatize from three to five days dry knotty cedar siding for 7 to 10 days and green siding for a minimum of 30 days.